Acquiring A Building Permit

Salem Building Department

270 Hartford Road, Salem, CT 06420

Phone: (860) 859-3873  ext: 250      Fax: (860) 859-1184          BuildingDept@salemct.gov

Most projects, construction, and installations (including roofing, siding, window and door replacement, pools, sheds, and decks) require a Building Permit.  Contact the Building Department Clerk to determine if your project requires a permit.  To apply for a Building Permit you will need:

 

bullet

An application for a Building Permit.  [You may also need a Zoning Permit, Septic Permit and/or Inland Wetlands Permit depending upon the project.]

 

bullet

A Plot Plan to show where on the property you plan to build.  The building, well, septic, setbacks, and any wetlands should be located on the Plot Plan.

 

bullet

The construction plans to show how you plan to build your project.

PROCEDURE 

1. Come into the Building Department to pick up your application forms and talk to the Building Department Clerk about your specific project.  A Plot Plan of your property may already be on file showing the location of the well, septic, etc. 

 

2. The Sanitarian, Wetlands, and Zoning requirements are the first that you may need to satisfy.  Make sure to talk with these departments early in the process as their requirements may influence your design and timetable.  If you need to apply for a Variance from the Zoning Board of Appeals, this process will take at least one thirty (30) days.  Please allow adequate time. 

 

3. Submit your completed applications to the Building Department including all plot plans and building plans (two (2) sets of each).  Your application should be processed within thirty (30) days. 

 

4. After your Building Permit has been issued, you may begin construction.  Call the Building Department Clerk to schedule required inspections.

 

It is your responsibility to schedule the required inspections

Minimum of 24 Hours Notice

 

bullet Footings - prior to pouring concrete
bullet Fireplace Throat
bullet Backfill - footing drains/waterproofing
bullet Fireplace Final
bullet Rough Framing
bullet Chimney - one flue above thimble
bullet Rough Electrical
bullet Firestopping/draftstopping
bullet Electrical Service
bullet Insulation - prior to sheetrocking
bullet Rough Plumbing and leak test
bullet Pool bonding
bullet Gas piping - pressure test/installation
bullet Final Inspection
bullet Rough HVAC
bullet C/O  (PRIOR to use or  occupancy)

 

 


 

 

Home ] Acquire Building Permit ] Building Dept Info ] Health Dept Info ] Planning & Zoning ]

Please submit questions, comments, or suggestions regarding this website to:

Webmaster@salemct.gov

Website development by VSquared, LLC